Back to Documents

Documents · 1008.01.070

Sites and Structures Report October 2018

Sites and Structures Reports

Images

Description

Progress to Date on restoration and site-improvement projects: I. Mouns Jones House: A. First story masonry wall facing the river was re-laid in September [Image #1, Photo 65, 8/27/18]. B. Paired cantilevered stone lintels have been set on stainless steel angles spanning the first story doorway [Images #2 and #3, photos #24, 10/3/18 and #7, 9/9/18, and Image #4, sketch dated 9/18/18 REV2 ] and window openings [Image #5, sketch dated 5/22/19]. The angle-brackets are redundant elements for stabilizing and leveling the stone and timber lintel components. The doorway elevation and header details are shown in Images #6 and #4, Sept 2018 drawings 9/7/18 REV and 9/18 REV2. C. 2d story masonry walling has reached window sill level, approx.. 3 ft. above 2d floor level [Images #7 and #8, photos## 86 & 90, 10/23/18]; D. 2d story window openings will be about 10" shorter than in 1st story; paired lintel stones spanning 2d story openings will be 5" high and about 28" long, set on stainless "L" angles bedded on stone jambs flanking openings [Images #9 and #5, drawing 9/5/18 and 5/22/19]; E. L-angled brackets bolted to rafter plates and to attic joists [Image #16, photo #50, 7/3/19] will mechanically utilize the joists as tie-beams, reciprocally neutralizing in stable tension the lateral thrust imposed by roof loads on the rafter plates and thrusting the upper courses of the masonry eaves walls. II.George Douglass House: A. The base and scratch plaster coatings, bound with goat hair, have been applied to the original bracket-framed [Image #10, photo GDH cove corn, 2/2/13] coved cornice above the primary façade [Image #11, Photo #9, 10/10/18]; the finish coat of lime plaster is being tested by Matthew Mosca for conformity of color hue to surviving original plaster fragments; a coved pair of brackets was fabricated and lathed as a trial piece for the plastered cornice system [Image #17, photo 2, 10/28/18]. B. Interior plaster repair and consolidation has progressed in 2d story chambers and hallway; a section of original hewn lath in the NW chamber will be left exposed as an exhibit of original interior fabric of the house [Image #12, photo 25, 10/1/18]; testing lime paint finish for color and coverage is in process; degraded lath repaired or replaced with early riven lath found in Douglass attic; many original minimally-oxidized wrought nails [Image #13, photo #94, 10/15/18] survive and will be used in the restoration; period-type wrought iron nails will be used where necessary to attach re-purposed lath; C. Flooring restoration in best parlor: original sound floor boards will be re-set after joists are leveled; replacement boards of same species and relatively narrow width-range have been acquired to complete front parlor flooring. D. Back/dining parlor in NW corner of 1st floor: majority of floor boards are compromised and will be consolidated where feasible and replaced when necessary; non-entry ["blind"] partition between parlors will be re-created; rear parlor will have upper walling plastered and dado ["wainscot"] paneled below chair railing, restoring original wall treatments; III. MV Pathways: MJH and MFH paths are top-dressed and open to pedestrian use; portal posts will be installed next week; Thun Trail path [Image #14, Photo 20, 10/25/18, with portal-posts] and WH path [Image #15, photo 4, 4/29/20] are complete but not fully cured [i.e., when organic binder and finely-screened aggregate are fully integrated during the de-hydration process] because of recurrent rainfall; will be open after drying for several days. IV. Swede lane has been re-dressed and leveled with #8 stone left over from other projects. Laurence Ward, December 2020; updated January, 2021.

Catalog details

Catalog number
1008.01.070
Record number
HPTSSR19
Accession number
1008.01
Date
October 2018
Object name
Report
Record type
Documents
Classification
Documentary Artifact

Subjects and search terms

Files